Page 21 of 226
Version: 3.3.5
– DR05 – 23.03.2017
8.
First time operation
Connecting the router to the power supply and switching on
8.1
The router is designed for installation in switch cabinets. The device is designed for mounting on top-hat rails (based
on DIN EN 50022).
Insert the router into the DIN rail. To do this, position the upper guide on
the rail and then press the router downwards against the rail until fully
inserted.
ADVICE
Before connecting the router to a network or PC, first ensure that it is properly connected to a power supply, other-
wise it may cause damage to other equipment. You should therefore follow the instructions given below
Connect the (10-30V DC) power supply to the
X1 terminal
of the router.
Ensure correct polarity reversal!
Now switch on the power supply. The green
Power
LED should light up immediately. After approx. 90-110 sec-
onds (depending on device model) the
Ready
LED should be solid. The device is now ready for operation.
For further support on the mbNET industrial router, visit our online support forum at
IMPORTANT
Connect equipotential bonding to the grounding lug on the
router’s top panel!
A
A
X1
|
X2