DLP-
553
363-206-295
1997
December
1,
Issue
21
of
2
Page
4:
NOTE
DDM-2000
one
tests,
end-to-end
do
to
used
is
procedure
this
When
assembly
other
the
and
end
near
the
as
to
referred
be
will
assembly
can
assembly
either
arbitrary;
are
designations
These
end.
far
the
as
assembly.
far-end
the
or
near-end
the
be
5:
NOTE
the
establish
to
shelf
each
at
made
be
must
cross-connections
Proper
TARP
tested.
being
circuit
DS3
the
for
path
end-to-end
complete
the
See
cross-connections.
STS-1
manual
supports
7
Release
Reports
and
Commands
the
in
commands
following
the
of
description
manual:
this
of
section
dlt-crs-sts1
,
ent-crs-sts1
,
rtrv-
crs-sts1
,
set-ne
and
,
rtrv-ne
See
.
Cross-Connection
Provisioning
this
of
section
Provisioning
and
Administration
the
in
provisioning.
cross-connection
on
information
more
for
manual
6:
NOTE
with
equipped
is
end
terminating
one
If
3STS1E
to
packs
circuit
with
equipped
is
end
terminating
other
the
and
service
EC-1
provide
3DS3
the
from
performed
is
test
transmission
DS3
the
packs,
circuit
and
CIT
the
If
end.
terminating
DS3
test-trmsn-t3:
is
command
terminating
EC-1
the
at
are
you
and
test
the
perform
to
used
being
the
end,
rlgn
to
end
DS3
the
into
log
to
used
be
may
command
the
using
test
the
perform
test-trmsn-t3:
command.
7:
NOTE
with
equipped
are
ends
terminating
both
When
3STS1E
packs,
circuit
end
one
tests,
DS3
For
performed.
be
may
tests
transmission
DS3
with
equipped
temporarily
be
may
3DS3
the
perform
to
packs
circuits
this
for
tests
transmission
perform
To
tests.
transmission
the
remove
configuration,
3STS1E
update
an
perform
end,
near
the
at
(
upd
the
install
and
),
3DS3
may
configuration
This
pack(s).
circuit
completed,
are
tests
the
After
direction.
MUX
the
in
tested
be
only
reinstall
and
update,
an
perform
packs,
circuit
temporary
the
remove
the 3STS1E
packs.
circuit