NTP-
012
363-206-295
Order
Circuit
:
1997
December
1,
Issue
12
of
10
Page
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
nodes
DRI
at
test
line
OC-3/IS-3
end-to-end
Perform
example,
(for
node
primary
FT-2000
the
with
associated
2).
Figure
in
C
and
B
nodes
27.
DLP-552
the
use
node,
DRI
OC-3/IS-3
the
At
ent-crs-sts1
or
ent-crs-vt1
and
"drop
proper
make
to
commands
cross-connections.
continue"
28.
DLP-549
the
use
node,
primary
FT-2000
At
FAULT-Switch-
Path-STS3-Line-Reset
the
switch
to
command
primary
to
node
secondary
from
tributary
designated
node.)
primary
to
traffic
(Switch
node.
29.
nodes
the
between
connections
EC-1/DS3
all
Remove
with
STS1E
LAA4
/
3STS1E
BBG12
packs
circuit
required.
if
removed,
30.
31.
complete.
now
is
upgrade
The