Order:
Circuit
363-206-295
NTP-
007
9
of
7
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
The
exist.
settings
TID
duplicate
no
Verify
rtrv-map-
network
the
in
shelf
any
at
used
be
may
command
determine
exist,
duplicates
If
settings.
display
to
network
the
use
and
settings
new
set-ne
make
to
command
settings.
new
15.
new
on
test
line
OC-3
end-to-end
automatic
Perform
extension.
optical
OC-3/IS-3
16.
DLP-552
17.
NOTE:
terminating
each
in
slots
proper
the
that
requires
service
Establishing
type
the
for
pack(s)
circuit
correct
the
with
equipped
properly
be
node
cross
numerous
requires
also
It
established.
being
service
of
required
the
of
path
the
representing
nodes
the
of
each
in
connections
verify
to
performed
be
should
tests
transmission
Additionally,
service.
circuit.
established
the
of
quality
and
continuity
the
For
established.
be
to
service
for
ready
is
network
The
the
use
shelf,
FT-2000
a
on
terminations
service
to
Manual
User/Service
FT-2000
the
in
procedures
EC-1
and/or
DS3
For
services.
those
establish
the
use
shelf,
OC-12
DDM-2000
a
on
terminations
establish
to
manual
User/Service
this
in
procedures
services.
those