Turnup:
System
363-206-295
NTP-
002
8
of
3
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
Install TGS/TG3
packs.
circuit
timing
DLP-502
Install
TSI
BCP3
5.
packs.
circuit
DLP-505
Install 23G/23G-U or
OLIU
23H/23H-U
6.
packs.
circuit
DLP-535
Install 177C
(
blanks
apparatus
APPBLK
the
in
)
MAIN-A-1 and MAIN-A-2(P)
adequate
ensure
to
slots
shelf.
the
through
flow
air
controlling
by
cooling
7.
Install
OLIU
21G/21G-U
with
required)
(if
packs
circuit
POWER
HIGH/LOW
to
set
switches
LOW.
8.
DLP-503
Install
OLIU
21G2-U
9.
required).
(if
packs
circuit
DLP-503
Install
OLIU
21D/21D-U
10.
required).
(if
packs
circuit
DLP-503