Order:
Circuit
363-206-295
NTP-
012
12
of
3
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
4.
!
1:
CAUTION
FT-2000
the
through
carried
being
is
traffic
Ensure
primary
to
node
1)
Figure
in
B
node
example,
(for
hits
service
unnecessary
prevent
.
command
(FT-2000
CONFIGURATION-Retrieve-
Crossconnection-STS3
)
!
2:
CAUTION
service
cause
may
cross-connections
wrong
the
of
Removal
interruption.
1:
NOTE
generated
be
will
alarms
removed,
are
packs
circuit
or
signals
When
performed.
are
procedures
update
until
2:
NOTE
cross-
all
until
alarm
an
without
unequipped
be
cannot
slots
STS1E
removed
be
must
cross-connections
The
removed.
are
connections
packs.
circuit
removing
before
first
3:
NOTE
cross-
same
the
using
be
to
going
is
pack
circuit
OC-3/IS-3
the
If
only
the
then
removed,
be
to
is
that
pack
circuit
EC-1
the
as
connects
where
node
the
at
those
are
deleted
be
to
need
that
cross-connects
cross-
pass-through
The
replaced.
being
is
pack
circuit
the
remain.
can
connections
the
at
cross-connections
interface
EC-1
the
Discontinue
FT-2000
the
with
associated
node
OC-12
secondary
node.
DRI
the
at
cross-connections
only
that
Note
the
using
when
discontinued
being
are
node
NTP-025.
of
procedures
NTP-025