363-206-295
DLP-
508
8
of
3
Page
1997
December
1,
Issue
3.
NOTE:
CIT
or
records,
office
orders,
Work
ent-crs-sts1
or
rtrv-crs-
sts1
cross-
STS-1
verify
or
make
to
used
be
may
commands
connections.
cross-
STS-1
proper
that
make/verify
network,
the
in
shelf
each
At
tested.
being
channel
DS3
each
for
made
been
have
connections
and
CIT
using
you
Are
4.
test-trmsn-t3
test?
this
perform
to
command
If YES
with
continue
then
,
5
Step .
If NO
to
proceed
then
,
21
Step
.
the
at
loopback
fiber
the
performed,
being
are
tests
local
If
1.
Figure
See
5.
near-end OLIU
performed,
being
are
tests
end-to-end
If
place.
in
be
must
following:
the
of
ONE
do
(a)
NOTE:
an
and
direction
mux
the
in
run
is
test
DS3
end-to-end
an
When
far
the
provision
end,
far
the
at
established
is
loopback
external
AIS
no
with
mode
CC
for
DS3
end
(
set-t3:
address:mode=cc,ais=no
VMR
the
if
Otherwise,
).
be
will
direction
receive
the
in
errors
only
then
used,
is
mode
is
loopback
a
that
recognize
not
may
system
the
and
monitored
up.
the
from
cord
patch
a
Connect
OUT
the
to
jack
IN
far-end
the
at
jack
channel
DS3
the
with
associated
point
cross-connect
STSX
or
DSX-3
tested.
be
to
the
Use
(b)
rlgn
the
use
and
shelf
far-end
the
to
in
log
to
command
opr-lpbk-t3:
address
or
opr-lpbk-ec1:
address
to
command
Use
end.
far
the
at
port(s)
EC-1
or
DS3
the
back
loop
logout
or
toggle
end.
near
to
CIT
of
control
return
to
command
t)
(crtl