DLP-
548
363-206-295
1997
December
1,
Issue
4
of
2
Page
Monitor
Far End
Monitor
Near End
Monitoring
Test
Line
Optical
End-to-End
1.
Figure
Panel
User
to
CIT
connect
location,
test
near-end
At
2.
CIT
and
connector
session.
establish
Reference: DLP-521
3.
!
CAUTION:
The
init-pm:reg=all
day
current
all
(clears)
initializes
command
storage
performance-monitoring
quarter-hour
current
all
and/or
registers.
NOTE:
the
doing
from
you
prohibit
procedures
local
If
init-pm:reg=all
the
Use
5.
Step
in
following
the
perform
may
you
command,
rtrv-pm-line
monitoring
performance
line
the
obtain
to
command
the
on
readings
the
note
report,
status
Today
wait
report,
the
in
line
no
be
should
There
report.
another
obtain
then
and
seconds
20
report.
first
the
from
readings
in
change
command
the
Enter
init-pm:reg=all
allowed.
if
,
seconds.
20
Wait
4.