Turnup:
System
363-206-295
NTP-
020
8
of
5
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
7.
NOTE:
the
that
requires
configuration
ring
OC-12
An
OLIU
MAIN-B-1
one
at
the
to
connect
(node)
shelf
OLIU
MAIN-B-2(P)
OC-12
adjacent
an
at
procedure
this
that
suggested
is
It
1.
Figure
See
(node).
shelf
node
near-end
the
from
starting
configuration
ring
OC-12
the
establish
the
until
node
next
the
to
then
node,
adjacent
an
to
continuing
and
node.
first
the
to
back
node
last
the
from
made
is
connection
final
ONE
from
loop
optical
the
remove
end,
near
the
At
OLIU
example,
(for
MAIN-B-2(P)
optical
the
with
associated
)
the
remove
end,
other
the
At
established.
being
span
associated
the
from
loop
optical
OLIU
example,
(for
MAIN-B-1
established.
being
span
optical
the
in
)
8.
NOTE:
end
far
for
used
(DCC),
channel
communication
data
section
The
(shelf)
element
network
each
at
enabled
be
must
communications,
to
tests
line
end-to-end
the
for
order
in
tested
being
interface
optical
been
has
it
If
"enabled".
is
channel
DCC
the
for
condition
Default
work.
the
use
disabled,
set-fecom:
command
shelf
each
at
far
enable
to
communications.
end
the
use
shelf,
each
At
set-fecom:
address:com=enabled
to
command
enabled.
is
(fecom)
communications
end
far
ensure