TAP-
119
363-206-295
Clearing
Trouble
:
1997
December
1,
Issue
2
of
2
Page
cleared?
AIS
STS1
of
indications
all
Have
5.
If YES then
,
PROCEDURE.
THIS
COMPLETED
HAVE
YOU
STOP.
If NO
with
continue
then
,
6.
Step
6.
NOTE:
both
shelf,
terminating
either
at
cross-connected
STS1
is
service
the
If
entire
the
terminate
to
equipped
properly
be
must
shelves
terminating
must
ends
both
provided,
being
is
service
DS3
if
example,
For
STS1.
with
equipped
be
3DS3
STS1
are
that
groups
the
in
packs
circuit
cross-connected.
the
Use
rtrv-eqpt
shelves
the
that
verify
to
shelves
both
at
command
not
are
shelves
the
If
provided.
being
service
the
for
equipped
properly
are
required.
as
packs
circuit
install
equipped,
properly
cleared?
AIS
STS1
of
indications
all
Have
7.
If YES then
,
PROCEDURE.
THIS
COMPLETED
HAVE
YOU
STOP.
If NO
with
continue
then
,
8.
Step
the
Using
8.
rlgn
central
the
have
or
possible,
where
command,
pass-
be
should
service
the
where
shelf
every
to
login
center
maintenance
the
use
and
mb-1)
to
mb-1
(e.g.
cross-connected
through
rtrv-crs-
sts1
cross-
is
2
Step
in
identified
slot
time
the
if
determine
to
command
is
service
If
records.
office
other
or
layout
circuit
in
specified
as
connected
dual
as
such
subnetworks,
maintenance
other
through
cross-connected
other
the
in
cross-connections
missing
for
look
(DRI),
interworking
ring
subnetworks.
the
use
cross-connects
missing
with
shelves
any
At
9.
ent-crs-sts1
mb-1).
to
mb-1
(e.g.
cross-connect
pass-through
the
provision
to
command
10.
PROCEDURE
THIS
COMPLETED
HAVE
YOU
STOP.
.