Acceptance:
363-206-295
NTP-
004
8
of
3
Page
1997
December
1,
Issue
LISTED
ORDER
IN
BELOW
ITEMS
DO
.
.
.
.
TO
GO
DETAILS,
FOR
2.
1:
NOTE
not
was
reference
timing
the
but
specified
is
mode
timing
external
If
the
turnup,
shelf
at
available
TGS/TG3
set
be
not
may
switches
option
the
on
set
be
must
mode
timing
specified
The
correctly.
TGS/TG3
packs.
circuit
2:
NOTE
by
done
be
must
update
an
changed,
is
setting
switch
option
the
If
the
depressing
momentarily
UPD/INIT
the
on
button
SYSCTL
the
after
TGS/TG3
reinstalled.
are
packs
circuit
3:
NOTE
the
and
selected
is
timing
external
If
ACTY
NE
lighted
remains
LED
the
after
TGS/TG3
the
and
CIT
the
use
reinserted,
is
pack
circuit
rtrv-sync
system.
the
of
mode
operational
the
check
to
command
is
mode
the
If
Holdover
of
instead
External
the
that
check
,
check
Also
connected.
are
references
timing
incoming
Mode
Switching
external
the
and
nonrevertive)
or
(revertive
Line
DS1
Code/Format
settings.
switch
Use
rtrv-sync
verify
to
node
each
at
command
network
the
in
node
one
least
At
options.
timing
proper
for
set
be
should
External
DS1
or
Running.
Free
Verify TGS/TG3
correctly
set
are
options
pack
circuit
[DLP-510].