DLP-
527
363-206-295
1997
December
1,
Issue
16
of
2
Page
1:
NOTE
to
messaging
synchronization
without
releases
from
upgrading
When
shelves
the
first
upgrade
to
suggested
is
it
feature,
this
with
releases
timed.
mult"
"external
or
timed"
"external
for
provisioned
are
which
derive
that
nodes
at
conditions
"holdover"
timing
prevent
to
is
This
line.
OC-12
the
from
timing
(Note)
Compatibility
Upgrade
Software
Inservice
OC-12
DDM-2000
A.
Table
to*
Upgrade
7.0
Release
Current
C†
(Ring)
3.1.n
U†
(Ring)
5.0.n
X†
(Ring)
5.1.n
X†
(Ring)
5.2.n
X
(Ring)
7.0.n
Note:
7.0
Release
TARP
using
be
should
subnetwork
a
in
shelves
OC-12
DDM-2000
All
software.
*
be
software
of
release
point
latest
the
that
recommended
is
it
upgrade,
an
doing
When
possible.
if
used,
U
system.
the
upgrade
to
only
download
software
local
Requires
X
system.
the
upgrade
to
only
download
software
remote
or
local
Requires
C
as
well
as
changes
equipment/fiber
on-site
with
procedure
upgrade
an
Requires
equipment
and
software
to
changes
Additional
system.
the
upgrade
to
download
software
release.
new
the
of
features
use
to
needed
be
may
provisioning
†
824-102-144,
See
considerations.
special
requires
stack
OSI
Incompatible
Lucent
Guide
Interworking
Operations,
Multi-Vendor
Family,
Product
2000
Technologies
for
,
considerations.
special