9-ii
Issue 1
December 1997
Table of Contents
Loopbacks
Tests
■
Transmission Tests
■
Operations Interface Tests
Performance Monitoring (PM)
■
DS3 Performance Monitoring (PM)
DS3 Path PM
DS3 Line Performance Monitoring
■
DS3 Performance Monitoring Parameters
■
Optical Parameters
Performance Monitoring (PM) Enabling
Laser Bias Current
Optical Transmit Power
■
OC-3 and OC-12 Section Parameters
Performance Monitoring (PM) Enabling
Severely Errored Frame Seconds (SEFS)
■
OC-3 and OC-12 Line Parameters
Performance Monitoring (PM) Enabling
Line Coding Violations (B2 Parity)
Errored Seconds (ES)
Severely Errored Seconds (SES)
Unavailable Seconds (UAS)
Line Protection Switch Counts
■
EC-1 Line Parameters
Performance Monitoring Enabling
Line Coding Violations (B2 Parity)
Errored Seconds (ES)
Severely Errored Seconds (SES)
Unavailable Seconds (UAS)
Line Protection Switch Counts
■
STS-1 Path Parameters
Performance Monitoring Enabling
STS-1 Path Coding Violations (B3 Parity)