Installation
WARNING
Relieving Internal Pressure
All internal pressure must be relieved to zero pressure before disassembly or inspection of the
strainer, vapor eliminator, any valves in the system, the packing gland, and the front or rear covers.
Serious injury or death from fire or explosion could result in performing maintenance on an
improperly depressurized and evacuated system.
Relieving Internal Pressure Procedure for LPG and NH
3
Meters
Follow these steps:
1. Close the belly valve of the supply tank.
2. Close the valve on the vapor return line.
3. Close the manual valve in the supply line on the inlet side of the meter. If no manual valve exists
on the inlet side, consult the truck manufacturer for procedures to depressurize the system.
4. Slowly open the valve/nozzle at the end of the supply line.
5. After product has bled off, close the valve/nozzle at the end of the supply line.
6. Slowly crack the fitting on top of the differential valve to relieve product pressure in the system.
Product will drain from the meter system.
Summary of Contents for LectroCount LCR 600
Page 1: ...LectroCount LCR 600 E3708 E3709 Series...
Page 13: ...Introduction 13 Dimensions...
Page 14: ...Introduction...
Page 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Page 54: ...Installation...
Page 61: ...Installation 61...
Page 63: ...Installation 63...
Page 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Page 75: ...Installation 75 Bill of Materials External Components...