Installation
Earth Grounds for Solenoid Valves
The Earth grounds for Terminals 16 & 19 are optional. The solenoid operated valves are grounded
through the component they are mounted on.
To wire a single stage valves for presetting:
1. Wire the S1 solenoid, as instructed above.
2. Run a jumper wire from Terminal 15 to Terminal 18.