Installation
Materials needed for wiring valves with 110 VAC solenoids
These materials are necessary, but are not supplied with the valve:
·
SPST relay switch (1 per solenoid)
·
20 AWG stranded wire (2 per solenoid)
·
Weatherproof flexible conduit, ½" diameter and ½" NPT conduit connectors or cable glands
·
PTFE tape or pipe sealant
To wire 110 VA C solenoids to the LCR 600:
1. Turn off all 100 VAC circuits before beginning the installation.
2. Install the specified relay switch(es) onto one leg of the 110 solenoid power supply circuit.
3. Connect the relay switch on the S1 power supply circuit to terminals 15 and 16 on block J13.
4. Connect the relay switch on the S2 power supply circuit to terminals 17 and 18 on block J13.
Disconnect Power (110VAC)
Turn off all 110VAC circuits before beginningthe installation.
Summary of Contents for LectroCount LCR 600
Page 1: ...LectroCount LCR 600 E3708 E3709 Series...
Page 13: ...Introduction 13 Dimensions...
Page 14: ...Introduction...
Page 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Page 54: ...Installation...
Page 61: ...Installation 61...
Page 63: ...Installation 63...
Page 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Page 75: ...Installation 75 Bill of Materials External Components...