Installation
51
Optical Air and Vapor Eliminators
Optical Air and Vapor Eliminator Installations
When ordered as part of a meter system with a LCR 600, the Liquid Control optical air and vapor
eliminators are bolted onto the strainer and wired to the LCR 600 at the factory. Optical air and vapor
eliminators can also be ordered separately and installed onto meter systems already in service. For
mechanical installation instructions, refer to the manual specific to the optical air and vapor eliminator.
Instructions for wiring optical air and vapor eliminators to the LCR 600 are provided below.
Materials needed for wiring valves
These materials are necessary, but are not supplied with the valve:
·
20 AWG stranded wire–3 per solenoid. Unnecessary for 3-way solenoid valves. Only 2 are
necessary for E7 solenoids.
·
Weatherproof flexible conduit, ½" diameter.
·
½" NPT conduit connectors or cable glands.
·
PTFE tape or pipe sealant.
Summary of Contents for LectroCount LCR 600
Page 1: ...LectroCount LCR 600 E3708 E3709 Series...
Page 13: ...Introduction 13 Dimensions...
Page 14: ...Introduction...
Page 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Page 54: ...Installation...
Page 61: ...Installation 61...
Page 63: ...Installation 63...
Page 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Page 75: ...Installation 75 Bill of Materials External Components...