Installation
Differential Pressure Transducer
Differential Pressure (∆P) Transducer Installation
When ordered as part of a meter system with a LCR 600, Liquid Control’s ∆P transducer is wired to the
LCR 600 at the factory. The ∆P transducer can also be ordered separately and installed onto a meter
system already in service. Refer to the ∆P transducer manual for complete installation instructions.
Instructions for wiring the ∆P transducer to the LCR 600 can be found below.
The ∆P Transducer requires an additional board (PN 81944) that mounts directly to the LCR 600 CPU
board.
Typically, a ∆P transducer operates together with a shutdown device, such as a valve or a dead-man.
Do NOT Try to Remove J2
The J2 terminal block is permanently attached to the CPU board.
Be Especially Careful with the CPU Board
Summary of Contents for LectroCount LCR 600
Page 1: ...LectroCount LCR 600 E3708 E3709 Series...
Page 13: ...Introduction 13 Dimensions...
Page 14: ...Introduction...
Page 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Page 54: ...Installation...
Page 61: ...Installation 61...
Page 63: ...Installation 63...
Page 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Page 75: ...Installation 75 Bill of Materials External Components...