Installation
55
Pulse Output Device
Pulse Output Device (POD) Installation
When ordered as part of a meter system with a LCR 600, Liquid Control’s Pulse Output Device (POD) is
installed onto the meter and wired to the LCR 600 at the factory. The POD can also be ordered
separately and installed onto meter systems already in service. For mechanical installation instructions,
refer to the POD manual. Instructions for wiring the POD to the LCR 600 can be found.
Materials needed for wiring valves
These materials are necessary, but are not supplied with the valve:
·
20 AWG stranded wire–3 per solenoid. Unnecessary for 3-way solenoid valves. Only 2 are
necessary for E7 solenoids.
·
Weatherproof flexible conduit, ½" diameter.
·
½" NPT conduit connectors or cable glands.
·
PTFE tape or pipe sealant.
Disconnect Power
Disconnect the power before working on the CPU board.
Summary of Contents for LectroCount LCR 600
Page 1: ...LectroCount LCR 600 E3708 E3709 Series...
Page 13: ...Introduction 13 Dimensions...
Page 14: ...Introduction...
Page 42: ...Installation Disconnect Power Disconnect the power before working on the CPU board...
Page 54: ...Installation...
Page 61: ...Installation 61...
Page 63: ...Installation 63...
Page 72: ...Installation Epson Printer Power Connections LectroCount LCR 600 Power Connections...
Page 75: ...Installation 75 Bill of Materials External Components...