Figure 100. Power distribution board cover installation
Step 5. Fasten the two screws to secure the power distribution board cover.
Figure 101. Cover screw installation
After you finish
1. Install the flash power module. See
“Install the flash power module” on page 80
2. Connect the flash power module cable to the RAID adapter. See
“Flash power module cable routing” on
.
3. Install the power supply unit. See
“Install a hot-swap power supply unit” on page 107
.
4. Install the top cover. See
“Install the top cover” on page 134
5. Complete the parts replacement. See
“Complete the parts replacement” on page 140
.
Hardware replacement procedures
113
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......