Step 1. Remove the power supply filler if necessary.
Step 2. Align the power supply unit with the bay; then, slide the power supply unit into the bay until it snaps
into position.
Figure 93. Hot-swap power supply unit installation
After you finish
1. Connect the power cable to the power supply and a properly grounded electrical outlet.
2. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Power distribution board replacement
Use the following information to remove and install the power distribution board.
Remove the power distribution board
Use this information to remove the power distribution board.
About this task
Attention:
• Read the following section(s) to ensure that you work safely.
–
–
“Installation Guidelines” on page 51
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 11
.
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Make preparations for this task.
.
Hardware replacement procedures
109
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......