A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Install the backplate.
a.
Insert the backplate into the chassis at an angle. Make sure the pins are against the
backplate on the backside.
b.
Rotate the backplate up towards the front of the server.
c.
Close the retaining clips to secure the backplate in place.
Figure 52. Backplate installation
1
Pin
After you finish
1. Connect the backplate cables to the system board or RAID adapter. See
2. Install the top cover. See
“Install the top cover” on page 134
3. Install all drives and drive fillers into the drive bays. See
“Install a hot-swap drive” on page 73
.
4. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Air baffle replacement
Use the following information to remove and install the air baffle.
Remove the air baffle
Use this information to remove the air baffle.
About this task
Attention:
• Read the following section(s) to ensure that you work safely.
.
Hardware replacement procedures
63
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......