• Make sure you save the data on your drive, especially if it is part of a RAID array.
• Before you remove or make changes to drives, drive controllers (including controllers that are integrated
on the system board), drive backplates or drive cables, back up all important data that is stored on drives.
• For proper system cooling, do not operate the server for more than 2 minutes without either a drive or a
filler panel installed in each bay.
Notes:
• Locate the documentation that comes with the drive and follow those instructions in addition to the
instructions in this chapter.
• The drive bays are numbered to indicate the installation order (starting from number “0”). Follow the
installation order when you install a drive. See
• The drives in a single RAID array must be the same type, same size, and same capacity.
• For a complete list of supported optional devices for the server, see
https://static.lenovo.com/us/en/
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. If the drive bay has a drive filler installed, remove it.
Step 2. Install the simple-swap drive.
Figure 58. Simple-swap drive installation
a.
Make sure the drive handle is in the open position. Slide the drive into the drive bay, and
push it until it stops.
b.
Rotate the drive handle inwards until it clicks and lock the drive in place.
After you finish
1. Install other drives or drive fillers if necessary.
2. Complete the parts replacement. See
“Complete the parts replacement” on page 140
3. Check the drive activity LED on the front operator panel to verify if the drives are operating correctly. See
“Front operator panel” on page 16
4. If you are instructed to return the component or optional device, follow all packaging instructions, and
use any packaging materials for shipping that are supplied to you.
.
Hardware replacement procedures
71
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......