A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Slide the front operator panel into the assembly bay.
Figure 69. Front operator panel (2.5-inch drive model) installation
Step 2. Install the two screws to secure the front operator panel.
Figure 70. Screws installation
After you finish
1. Connect the front operator panel cables to the system board. See
“Front panel cable routing” on page
2. Install the top cover. See
“Install the top cover” on page 134
3. Complete the parts replacement. See
“Complete the parts replacement” on page 140
Remove the front operator panel (3.5-inch drive model)
Use this information to remove the front operator panel (3.5-inch drive model).
About this task
Attention:
• Read the following section(s) to ensure that you work safely.
.
Hardware replacement procedures
83
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......