“Installation Guidelines” on page 51
• Power off the server and peripheral devices and disconnect the power cords and all external cables. See
“Power off the server” on page 11
.
• If the server is installed in a rack, remove the server from the rack.
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. Make preparations for this task.
a. Remove the top cover. See
“Remove the top cover” on page 132
b. Disconnect the front operator panel cables from the system board. See
.
Step 2. Remove the two screws that secure the front operator panel.
Figure 71. Front operator panel removal
Step 3. Pull out the front operator panel from the server.
Figure 72. Front operator panel removal
84
ThinkSystem SR250 V2 Maintenance Manual
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......