![background image](http://html.mh-extra.com/html/lenovo/7d7q/7d7q_maintenance-manual_202600082.webp)
Watch the procedure
A video of this procedure is available at YouTube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-
Procedure
Step 1. If the drive bay has a drive filler installed, remove it.
Step 2. Install the hot-swap drive.
Figure 61. 2.5-inch hot-swap drive installation
Figure 62. 3.5-inch hot-swap drive installation
a.
Make sure the drive handle is in the open position. Slide the drive into the drive bay, and
push it until it stops.
b.
Rotate the drive handle inwards until it clicks and lock the drive in place.
After you finish
1. Install other drives or drive fillers if necessary.
2. Complete the parts replacement. See
“Complete the parts replacement” on page 140
3. Check the drive activity LED on the front operator panel to verify if the drives are operating correctly. See
“Front operator panel” on page 16
4. If you are instructed to return the component or optional device, follow all packaging instructions, and
use any packaging materials for shipping that are supplied to you.
Fan replacement
Use the following information to remove and install the fan.
74
ThinkSystem SR250 V2 Maintenance Manual
Summary of Contents for 7D7Q
Page 1: ...ThinkSystem SR250 V2 Maintenance Manual Machine Types 7D7Q and 7D7R ...
Page 8: ...vi ThinkSystem SR250 V2 Maintenance Manual ...
Page 20: ...12 ThinkSystem SR250 V2 Maintenance Manual ...
Page 42: ...34 ThinkSystem SR250 V2 Maintenance Manual ...
Page 176: ...168 ThinkSystem SR250 V2 Maintenance Manual ...
Page 180: ...172 ThinkSystem SR250 V2 Maintenance Manual ...
Page 183: ......
Page 184: ......