Rigging procedures
14.
Connect both front rigging points between ARRAY#1 and ARRAY#2 as follows:
a) Slide both KARA#4 front arms up and align them with the KARA#3 front bottom rigging points.
b) On KARA#3, remove both front bottom R-BLP from the storage holes and re-insert them into the bottom yellow link
holes to secure the front arms to KARA#3.
c) Lower the array until the front corners of KARA#3 and 4 are in contact (front arms kept vertical).
d) Secure the front arms on KARA#4 by inserting both top R-BLP into the top yellow link holes.
15.
Raise the array to a height for which the angle arms of ARRAY#2 are within comfortable reach and remove the ight-
case from the rigging location.
16.
With 2 people working simultaneously on each side of the array, connect both rear rigging points between ARRAY#1
and ARRAY#2 as follows:
a) Remove the KARA#4 rear top R-BLP from its storage position, slide the angle arm so as to align the cursor with
the desired angle value, and secure by re-inserting the R-BLP into the corresponding angle hole (0°/2°/4° or
1°/3°/5°/7.5°/10°).
b) While grabbing the back handle of KARA#6, rotate ARRAY#2 so as to align the KARA#3 and KARA#4 rear
rigging points.
c) Link both rigging points by removing the KARA#3 rear bottom R-BLP from its storage position and reinserting it
into the yellow link hole.
17.
Set the inter-enclosure angles in ARRAY#2 by applying step
(p.53).
54
Kara owner's manual (EN) version 1.0