Rigging procedures
6.
Attach a second SB18 (hereafter called SB18#2) to SB18#1 as follows:
a) Place SB18#2 at the rigging location and remove the dolly board.
b) Turn SB18#2 logo upwards and front face towards the audience.
c) Place SB18#2 on SB18#1 by aligning the four rigging points.
d) Attach the four rigging arms of SB18#2 to SB18#1 as follows: disconnect a T-BLP from SB18#2, rotate the
rigging arm down, re-connect the T-BLP to the SB18#1 rigging point and the rigging arm; repeat this procedure
until all 4 arms are secured.
Kara owner's manual (EN) version 1.0
117