Rigging procedures
17.
Remove the KARA-MINIBU/KARA-MINIBUEX from SB18#1 as follows:
a) Remove the four T-BLP from both KARA-MINIBUEX.
b) Lift the KARA-MINIBU/KARA-MINIBUEX up and remove it from SB18#1.
c) Rotate the four SB18#1 link arms down.
d) Lock the link arms in closed position by re-inserting the four T-BLP into the top SB18#1 link points.
18.
Attach a dolly board to each of the SB18#1 and SB18#2 subwoofers.
19.
Remove SB18#2 from SB18#1 by applying step
(p.88) and remove both subwoofers from the rigging
location.
Kara owner's manual (EN) version 1.0
89