Inspection and preventive maintenance
Inspection and preventive maintenance
How to do preventive maintenance
Inspect the system before any deployment and after any corrective maintenance operation.
Perform preventive maintenance at least once a year.
Refer to the maintenance manuals for advanced maintenance.
Rigging and hardware
(p.36) on each rigging part.
Use the
(p.36) to identify critical parts of the system and apply the specic checks
described in the
(p.43).
(p.40).
If any parts are damaged, order the repair or replacement kits listed in
(p.43) and contact your
L-Acoustics representative for further instructions.
Acoustics
(p.46).
(p.48) to detect any degradation in sound quality.
If necessary, refer to the
(p.138) section for speaker repair kits and maintenance instructions.
Kara owner's manual (EN) version 1.0
35