Rigging procedures
18.
Remove the M-BUMP from SB18#1 as follows:
a) Disconnect a bottom T-BLP from the M-BUMP.
b) Rotate the rigging arm down.
c) Re-connect the T-BLP to SB18#1 so as to lock the rigging arm in closed position.
d) Repeat this procedure until all 4 arms are locked in closed position.
e) Remove the M-BUMP from the array.
19.
If necessary, set the M-BUMP for transport by removing each M-BAR as follows: remove both T-BLP from the M-BAR
studs, remove the M-BAR, and re-insert both T-BLP in their storage locations.
20.
Attach two dolly boards to SB18#1 and 2.
21.
Detach SB18#2 from SB18#1 by applying step
(p.78) and remove both subwoofers from the rigging location.
Kara owner's manual (EN) version 1.0
79