Rigging procedures
15.
With 2 people working simultaneously on each side of the array, secure the rear link points between ARRAY#1 and
ARRAY#2 as follows:
a) Remove the KARA#4 rear top R-BLP from its
storage
hole, slide the angle arm so as to align the cursor with the
chosen angle label, and lock it in place by re-inserting the R-BLP into the corresponding angle hole (0°/2°/4° or
1°/3°/5°/7.5°/10°).
b) While grabbing the back handle of KARA#6, rotate ARRAY#2 so as to align the KARA#3 and KARA#4 rear link
points.
c) Lock ARRAY#2 in place by removing the KARA#3 rear bottom R-BLP from its
storage
hole and re-inserting it into
its
link
hole.
16.
Set the inter-enclosure angles in ARRAY#2 by applying step
(p.62).
17.
If the array is intended to be own in pullback conguration, attach a KARA-PULLBACK to the bottom Kara as
follows:
a) Align the KARA-PULLBACK studs with the Kara link points (long studs at the back).
b) Remove the four Kara bottom R-BLP from their
storage
holes and lock theKARA-PULLBACK in place by re-
inserting them into their
link
holes.
c) Attach the hook or stinger of an additional motor to the KARA-PULLBACK shackle.
64
Kara owner's manual (EN) version 1.0