Rigging procedures
9.
Bring another full Kara ight-case to the rigging location and remove the lid. Direct the front face of the Kara array
towards the audience. In the following, the array will be designated as ARRAY#2 and the enclosures as KARA#4 to
KARA#6 from top to bottom.
10.
Check the inter-enclosure attachments in ARRAY#2 by applying step
(p.60).
11.
On KARA#4, open both front arms as follows (repeat for each one): remove the front top R-BLP from its
storage
hole, rotate the front arm up, and slide it down. Do not re-insert the R-BLP.
12.
Raise ARRAY#1 slightly higher than the front arms of ARRAY#2 and place ARRAY#2 beneath ARRAY#1.
13.
Secure the front link points between ARRAY#1 and ARRAY#2 as follows:
a) Slide each KARA#4 front arm up and align it with the KARA#3 front bottom link point.
b) Secure each KARA#4 front arm to KARA#3 by removing the KARA#3 front bottom R-BLP from its
storage
hole
and re-inserting it into its link hole.
c) Lower the array until KARA#3 and KARA#4 front corners are in contact (keep the front arms vertical).
d) Secure each front arm to KARA#4 by inserting the KARA#4 front top R-BLP into its
link
hole.
14.
Raise the array to a height for which the angle arms of ARRAY#2 are within comfortable reach and remove the ight-
case from the rigging location.
Kara owner's manual (EN) version 1.0
63