Rigging procedures
9.
With 2 people working simultaneously on each side of ARRAY#1, set the inter-enclosure angles as follows:
a) While grabbing the back handle of KARA#3, remove the rear top R-BLP from KARA#2.
b) Rotate KARA#2 so as to align the cursor of the angle arm with the desired angle value.
c) Secure by re-inserting the R-BLP into the corresponding angle hole (0°/2°/4° or 1°/3°/5°/7.5°/10°).
d) Repeat the procedure for KARA#3.
10.
Place another full ight-case at the rigging location and remove the lid. Direct the front face of the 3-Kara array
towards the audience. In the following, the array will be designated as ARRAY#2 and the enclosures as KARA#4 to
KARA#6 from top to bottom.
11.
Check the inter-enclosure connections in ARRAY#2 by applying step
(p.51).
12.
On KARA#4, take both front arms out as follows (repeat for each one): remove the front top R-BLP, rotate the front
arm up, and slide it down. Do not re-insert the R-BLP.
13.
Raise ARRAY#1 slightly higher than the front arms of ARRAY#2 and place ARRAY#2 beneath ARRAY#1.
Kara owner's manual (EN) version 1.0
53