G-27
L4400 , WSM
G GENERAL
Toe-in
1. Park the tractor on the flat place.
2. Inflate the tires to the specified pressure.
3. Turn steering wheel so front wheels are in the straight ahead
position.
4. Lower the implement, lock the parking brake and stop the engine.
5. Measure distance between tire beads at front of tire, hub height.
6. Measure distance between tire beads at rear of tire, hub height.
7. Front distance should be 2 to 8 mm (0.079 to 0.315 in.) less than
rear distance.
8. If the measurement is not within the factory specifications, adjust
by changing the tie-rod length.
■
Adjusting
2WD
1. Detach the snap ring (3).
2. Loosen the tie-rod lock nut (1).
3. Turn the outer tube (2) to adjust the tie-rod length until the proper
toe-in measurement is obtained.
4. Retighten the tie-rod lock nut (1) and rod mounting screw.
5. Attach the snap ring (3).
4WD
1. Detach the snap ring (6).
2. Loosen the tie-rod lock nut (4).
3. Turn the tie-rod joint (5) to adjust the rod length until the proper
toe-in measurement is obtained.
4. Retighten the tie-rod lock nut (2).
5. Attach the snap ring (6).
IMPORTANT
■
• A right and left tie-rod joint is adjusted to the same length.
W1038470
Toe-in ((B) - (A))
Factory spec.
2 to 8 mm
0.079 to 0.315 in.
Tightening torque
Tie-rod
lock nut
2WD
83.4 to 88.3 N·m
8.5 to 9.0 Kgf·m
61 to 65 ft-lbs
4WD
166.7 to 196.1 N·m
17.0 to 20.0 Kgf·m
123 to 145 ft-lbs
(1) Tie-rod Lock Nut
(2) Outer Tube
(3) Snap Ring
(4) Tie-rod Nut
(5) Tie-rod Joint
(6) Snap Ring
(A) Wheel to Wheel Distance at Front
(B) Wheel to Wheel Distance at Rear
(C) Front
(a) 2WD
(b) 4WD
KiSC issued 07, 2007 A
Tractor Manuals Scotland - Please Do Not Copy
Tractor Manuals Scotland