Chapter 4 RA83/84/85/93/94/95 Series
Installation OperationManual
4.6.4.2 Flush mounting
Operation Unit
Preparation:
(1) Cut aperture in surface to the dimensions shown below
(2) Mark screwing points with a sharp-edged tool.
Figure 4.10 Dimensions of the Operation unit mounting aperture
Installation:
(1) Remove the mounting bracket from the Operation unit.
(2) Remove a screw cover, which is fitted on each corner of the Operation unit front
face. (Refer to Figure 4.13)
(3) Put the Operation unit and connecting cable into the aperture flush with the panel
surface. Connect the cable to the Processor unit at the specified receptacle.
(Refer to Figure 4.14)
(4) Fasten the Operation unit to the panel using a 4 mm tapping-screw. (4 positions)
In case you use M4 screws select an appropriate length that best suits fixing the
unit to the panel.
(5) Refit the screw covers removed in step (2).
4-10
93142105-02