www.kolidainstrument.com
112
5) Sight at the point that to be intercepted near the
slope, press OBS. to start slope setting-out. It
chooses proper slope from the data that input in
previous step. Supposes the height of target point is
level benchmark, and calculate the point to be
intercepted. The offset from measured point to
calculated point is displayed.
OBS.
Slope Set-Out
Left 6.398 m
.B 9.321 m
H 2.546 m
HAR 178°13′25″
Mode OBS.
6) Move prism according to the indication of screen,
press OBS. When 2 Close are shown in the second
and third line of the screen, it means that the set-out
point is found.
Move prism
+
OBS.
Slope Set-Out
Close 0.000 m
Close 0.001 m
H 1.596 m
HAR 125°11′25″
Mode OBS.
7) Press ESC to return to the screen of choosing
slope.
Set out the next point fron STEP 3.
Slope Set-Out
Cut L 2.150
Fill L
0.000
Cut R
2.150
Fill R
0.000
Left Right
1) An intersection can not be computed if the ground surface passes through the connecting point.
2) The cut/fill is not displayed because the cut/fill value at the computed point is zero.