www.kolidainstrument.com
123
20.1.11 Transfer coord data to job
User can transfer coordinate data into working job.
Operating Procedure
Operation
Display
1) Select “1. JOB” in the “Memory Mode Screen”
and press ENT (or press numeric key 1), the “JOB
Management Screen” is displayed.
Press
▲
or
▼
key from keyboard to enter Enter
page 2.
“1.JOB”
+
OK
Mem./JOB(1/2)
1. JOB Selection
2. Coord. Read JOB
3. JOB Export
4. Coord. Import
5. Coord. Send
6. Coord. Receive
Mem./JOB(2/2)
7.Key in Coord.
2) Firstly choose current working job, then select “7.
Key in Coord.” then press ENT (or press numeric
key 7).
7.Key in
Coord.
JOB Selection
Job 0002
VIEW OK
3) Choose a Job name or Create a new job name.
(or press VIEW to choose from local disk or SD
card).
OK to Confirm.
OK
List
STN1 Know
STN1 Know
101 Know
102 Know
103 Know
VIEW SRCH DEL ADD
4) All the coordinates are listed now..
Press ADD to enter the Coordinate Data input
screen.
ADD
5) Input the coordinates value N E Z, point name,
and code. When the cursor moves to the line of
CODE, softkey CODE will be shown, you can read
code from memory or input the number of code.
After each entry press
▼
.
Input
coordinate,
point name,
code
Add know data
N : 0.000 m
E : 0.000 m
Z : 0.000 m
Pt : 109
CODE : KOLIDA
REC. CODE