www.kolidainstrument.com
95
Chainage 1000 1300 1800 2300
Elevation 50 70 60 90
Curve length 0 300 300 0
Intersection points can be input in any order. After input data of a point, press OK to save it and go
to input next one. Press ESC to exit without saving.
PROCEDURE
Operating Procedure
Operation
Display
1) Select “2. Edit VT AL” from Define Roads
menu.
Select “2.
Edit VT AL”
Define Raods(1/2)
1. Edit HZ AL
2. Edit VT AL
3. HZ AL Import
4. VT AL Import
5. Receive HZ AL
6. Receive VT AL
2) Input chainage, elevation and curve length.
Input
chainage,
elevation
and curve
length.
Vertical AL
NO. :1
CN : 1000.000
Elev: 50.000 m
Dist: 0.000 m
OK
3) Press OK to record the data. Then to input next
data.
OK
Vertical AL
NO. :1
CN : 1000.000
Elev: 50.000 m
Dist: 0.000 m
OK