![KLA Tencor P-16+ User Manual Download Page 440](http://html1.mh-extra.com/html/kla-tencor/p-16/p-16_user-manual_1974647440.webp)
P Series Profiler - Preparing for Shipment Procedure
KLA-Tencor P-16+ / P-6 User’s Guide
B-2
KLA-Tencor Confidential
0142530-000 AB
3/13/09
7.
Lower the head down until the protection plate comes into contact with the
shipping clamp. This can be achieved by clicking FOCUS from within the XY
screen of the Profiler software OR by doing the following:
NOTE:
1) For UPI based tools (P16 and below), (-) negative provides downward
Z motion. For MIB based tools (P16+ and P6), (+) provides downward
motion.
2) Z axis # varies as well depending on whether it's an MIB or UPI based
tool.
a.
Exit the Profiler software
b.
Click on START and select RUN
c.
Type in DRUN and press ENTER
d.
Press m for Motion Commands (All letters should be lower case)
e.
Press m for Move Commands
f.
Press a for Set Active Axis
g.
Press 2 to select the Z axis
h.
Press m for Move Relative
i.
Type in -26000 and press ENTER
j.
The measurement head should start coming down
k.
Press s to stop the motion of the elevator once it has come into contact with
the stage clamp. It should press down on the clamp hard enough to hold
the XY stage and the clamp in place but not so hard that it crushes the stage
clamp or causes the left and right sides to lift upward.
l.
If the motion is stopped too soon, continue the downward travel in smaller
increments (m, -10000, ENTER).
m.
When the contact between the protection plate and the shipping clamp is
good, press q several times to exit the DRUN software.
8.
Exit the Operating System and power down the system.
9.
Install the turn buckle between the measurement head and the system chassis.
a.
Loosen the turn buckle to increase the length to maximum
b.
Place the two S hooks on the circular side of the turn buckle assembly and
lock the last S hook underneath the edge of the system chassis (best
achieved near the rear of the tool, between the Y motor assembly and the
elevator assembly)
c.
Place the hook portion of the turn buckle onto the base of the measurement
head (see figure below) and rotate the assembly until it is tight, locking the
measurement head down onto the XY stage.
10.
Re-install the side panel to the system using the two large black knobs.
NOTE:
Note: P6 differs from P16+ in that there's a permanently mounted
hook, therefore one only needs to insert the turnbuckle round side in the
hook, and tighten.