KLA-Tencor P-16+ / P-6 User’s Guide
Introduction & Safety - Safety
yelim
inary
Lockout/Tagout Procedure
1
If the system is hardwired to facilities power, the lockout/tagout procedure is
to be set by the system owner. Service personnel authorized to perform this
type of lockout/tagout must be trained by the system owner in accordance
with their set procedures.
For systems using the power cord disconnect lockout/tagout procedure for a
non-emergency system shutdown, use the following steps:
1.
Notify all affected personnel that a lockout is required.
2.
Close all running software.
3.
After ensuring that the system software has been properly shut down to
avoid system start-up problems later, turn off the system by pressing the
OFF
button on the computer and unplug the power supply.
4.
Disconnect the Main Power Cord from the outlet and secure it in the Plug
Lockout device as illustrated in
, step 1.
5.
Attach the lockout hasp with warning tag to the
lockout device
, as
, step 2.
HAZARDOUS VOLTAGE - SHOCK HAZARD:
For personal safety
and system reliability, only qualified service personnel, trained on
service procedures for the system being serviced, are authorized to
open or remove the panels or any protective electrical shielding.
Figure 1.1
Power Cord Plug Lockout/Tagout
STEP 1
STEP 2
STEP 3
Plug
Lockout Device
Padlock
Tag