Keysight N5290/1A Service Guide 3-11
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
4.
When finished, the following dialog box is displayed. Remove the load and
press Finish. Refer to
Figure 3-5
Millimeter Installation Cal – Dialog Box Load Calibration "Finish"
5.
The following dialog box is displayed until the calibration is finished (i.e., It
is not necessary to connect a calibration kit open for this step. Refer to
.
Figure 3-6
Millimeter Installation Cal – Dialog Box Open–circuit Calibration Ongoing/
"Finish"
6.
If prompted, repeat steps
through
for all of the other ports requiring
calibration.
The Head Cable Checks
A faulty test port cable can cause a failure in the verification test. The following
checks are not required, but are recommended to verify the performance of the
test port cable. These checks verify the integrity of the head cables that
connect to the N5292A test set.
—
“Head Cable Stability Check” on page 3-12
Accessories Used in the Head Check
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...