3-2 Keysight N5290/1A Service Guide
System Tests and Adjustments
Information in This Chapter
3-
Chapter Three at-a-Glance
Section Title
Summary of Content
Items to consider or procedures to perform before testing is begun:
—
Verify the Operating Environment
—
Protect Against Electrostatic Discharge (ESD)
—
Review the Principles of Connector Care
The ANSI/NCSL Z540.3-2006 and ISO/IEC 17025 process of verifying
your analyzer/test set.
The Non-Standards Compliant process of verifying your analyzer/test
set.
Performing the operator’s check N5290/1A and N5292A test set.
Inspecting and checking your test cables.
Perform these checks before performing system
verification
.
(TME) Performance Tests (N5290/1 A
Millimeter System Only)
a
a. These performance tests are included in the analyzer’s firmware for Options S93898A.
A brief summary of the TME N5290/1A millimeter-wave test system
performance test process.
b
b. These adjustments are included in the analyzer’s firmware on all models and options.
Setups and procedures for adjusting your analyzer:
—
—
—
—
—
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...