4-18 Keysight N5290/1A Service Guide
N5290/91A Troubleshooting
N5292A Test Controller Troubleshooting
4-
Figure 4-8
Using the Power Supply Fixture to Check the Test Set Motherboard (TSMB)
J3 (Port 1)–J6 (Port 4) Connector’s DC Test Point Values – Verifies the mm
Heads Have the Correct Voltages (i.e., J3 (Port 1) is shown, the other ports
are similar)
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...