Keysight N5290/1A Service Guide 3-9
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
—
“If the Head Check Fails” on page 3-15
Initializing the N5290/1A Broadband System
1.
If required, assemble the system. Refer to Install the System, refer to
https://literature.cdn.keysight.com/litweb/pdf/N5292-90002.pdf
.
2.
Clean the test ports, shorts, and adapters. Torque to specification.
3.
On the PNA press
Setup > External Hardware > Millimeter Config
4.
Press
Instrument > Setup > External Hardware > Millimeter Head Off to
Millimeter Head On
5.
Power down the PNA.
6.
On the N5292A test set controller: verify the test set is powered down.
7.
Power up the PNA.
8.
Power up the N5292A.
The N5290/1A system should now initialize and recognize the mmW modules.
The port 1 module LED should be blue (addressed by the PNA and active) and
the other test port(s) should be green (no bias and on standby). See also,
the Head Check Fails” on page 3-15
.
Running the Installation Calibration
This installation calibration should be ran when you first install your system
and whenever you make any changes to your system’s configuration. See also,
“If the Head Check Fails” on page 3-15
.
1.
On the PNA, verify your N5290/1A system is in the correct configuration:
press
Setup > External Hardware > Millimeter Config
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
.
If a cable has been changed or disconnected reconnected or similar
“Running the Installation Calibration” on page 3-9
EXCEPTION
: If you swapped in a new head or swapped heads on the ports
“Initializing the N5290/1A Broadband System” on
.
If the N5290/1A system is already installed and no changes have occurred
to any of the instruments or cables, refer to
.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...