Keysight N5290/1A Service Guide 3-33
System Tests and Adjustments
N5292A Functional Verification Procedure
When a defective cable or connector has been replaced and the test set
has been repaired, the following tests are required:
—
Test set and N5290A/91 A system calibration
— Insertion Loss/Match-S-parameters (verify PNA Cal has been
—
LO Verify (Run after Insertion Loss/Match are verified.)
IMPORTANT!
LO power verification is only required on the port that the
connector or and cabling was replaced.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...