Keysight N5290/1A Service Guide 4-27
N5290/91A Troubleshooting
N5292A Test Controller Troubleshooting
Front Panel Active LED
Front Panel power switch LED check. If the power switch LED indicator is not
operating, verify the power switch cable connection on both the front panel
and the test set motherboard (TSMB) is connected securely. Proceed to the
next section for further troubleshooting before replacing the power switch
keypad board. Refer to
and to
“Removing and Replacing the Front
Panel Power Switch Board” on page 7-28
— Verify the TSMB LEDs are on. Refer to
Motherboard (TSMB)” on page 4-9
.
RF OUT Failures
If the test ports are not switching, or fail the Operational Check the following
procedures can be used to verify the failure. The procedures assume power
supplies, test set motherboard, and front panel LEDs are working. Suspect the
LOPA, LODA, phase compensation board, and ribbon cable connections to the
test set motherboard (TSMB). Refer to
, and
1.
Swap millimeter-wave heads.
2.
Inspect the ribbon cable connections from the LOPA, LODA, phase
compensation boards to the TSMB. If necessary re-seat the connector(s).
,
.
3.
Start by measuring the power at A2 LOPA, A3 LODA, or A4 phase
compensation board. If you find incorrect power levels and suspect a
component has failed verify the DC voltages in
and
. If the DC
voltages are OK, then refer to
“Verifying the A2 LOPA, A3 LODA, and A4
Phase Compensation Boards” on page 4-22
. Replace the failed
component.
LO Out Failure
If the LO Out fails the Operation Verification test the following procedure can
be used to verify the failure. The procedures assume power supplies, TSMB,
and the front panel LEDs are working. Suspect the bias cables. Refer to
“Verifying the A2 LOPA, A3 LODA, and A4 Phase Compensation Boards” on
1.
If one or more of the LO ports are working, suspect the LODA.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...