3-14 Keysight N5290/1A Service Guide
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
3-
Figure 3-8
Lifting the cable at the bend and watching for trace spikes/instability
7.
Gently extend the head (exercising care to not overextend) and rotate side
to side (less than 90 degree) making sure traces are relatively stable and
still tracking each other. Refer to
.
Figure 3-9
Gently extending the head and exercise carefully so as not to overextend
8.
Repeat steps
through
as required for suspected faulty ports.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...