3-12 Keysight N5290/1A Service Guide
System Tests and Adjustments
The N5290/1A Millimeter Test System Preliminary Check
3-
For more, refer to
“Required Service Test Equipment” on page 2-3
Head Cable Stability Check
1.
Press
UTILITY > Preset
.
2.
Connect short (f) to head.
3.
Allow the analyzer and heads to warm up for two hours, before
proceeding.
4.
Setting analyzer for dual trace display showing both the reference and
receiver traces (i.e., B2,2 and R2,2 for port 1 and port 2.):
Example of Port 2 Setup:
a.
Set trace 1 to B2,2: Press I
nstrument > Trace > Trace Setup >
Measure > Receivers > B,2 > OK
Trace 1 should display a green LED in the Trace softkey Menu
b.
Change scale R,1 trace 2: Press
Instrument > Trace > Trace Setup >
Measure > Receivers > R2,2 >OK
.
Trace 1 and Trace 2 should display a green LED in the Trace softkey
Menu.
c.
Change scale B2,2 trace 1: Press
Response > Scale > Scale > 0.1
Enter
.
d.
Change scale R2,2 trace 2: Press
Response > Scale > Scale > 0.1
Enter
.
e.
Narrow IF bandwidth: Press
Response > Avg BW> IF Bandwidth >
100 > Enter
.
f.
Normalize the traces: Press
Response > Math > Normalize
Repeat for the other trace.
Equipment Type
Model of Part Number
Alternate Model or Part
Number
Calibration kit, 1.0 mm
85059B
Equivalent or better
1.00 mm (f) to 1.00 mm (f) (short thru)
11920-60002
a
n/a
a. This is a short thru that is not included in the 85059B calibration kit.
For best results, instruments should be powered up for two hours. If
instruments are not warmed up, the trances will be unstable.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...