3-18 Keysight N5290/1A Service Guide
System Tests and Adjustments
N5292A Functional Verification Procedure
3-
Required Equipment
— The following Keysight ET’s are required for testing the N5292A test set:
— Power Supply fixture (N5292-60130) – Use with Launch Test
application (
) to verify the power supplies at the port of
the test set and mm head DAC function on the test set motherboard
(TSMB). Refer to
.
b. Use x5 as connector savers on the rear panel IF ports (optional). Use x3 for front panel wideband IF and
LFE Eterms.
c. N5240-60092 is the longer cable that is used on the PNA LO OUT to N5292A test set’s LO IN (rear panel)
IMPORTANT!
Ensure that:
—
N5292A test set is powered down, before connecting the power supply
fixture ET57265, to avoid damaging the N5292A test set or the power
supply fixture ET57265.
—
N5292A test set is powered down and the ET is removed immediately
after
the testing is complete.
IMPORTANT!
For purchasing test set functional verification test fixtures,
please contact Keysight. Refer to
“Contacting Keysight” on page 2-7
.
Summary of Contents for N5222B
Page 3: ...3 ...
Page 4: ...4 ...
Page 10: ...6 Keysight N5292A User s and Service Guide Contents ...
Page 28: ...1 18 Keysight N5290 1A Service Guide Safety and Regulatory Information Site Preparation 1 ...
Page 86: ...3 50 Keysight N5290 1A Service Guide System Tests and Adjustments Adjustments 3 ...
Page 128: ...5 10 Keysight N5290 1A Service Guide Theory of Operation Theory of Operation 5 ...
Page 225: ...Installation Note Xxxxx xxxxx 3 ...